Business project implementation schedule example

If a company receives an order for construction work, it needs to plan organizational measures. All stages of work and supervision over their implementation must be clearly defined and scheduled. For more details on how the construction schedule is drawn up, read on.

The construction work schedule is a document that establishes the sequence, relationship between the time and timing of assignments. It is developed according to the rules and regulations at the stage of drawings by the POS design organization. It is then supplemented by a production plan drawn up by the contractor.

The planning objectives are:

  • justification of the duration of construction;
  • determination of the timing of putting the complex elements into operation;
  • calculation of the duration of work;
  • determination of the size of capital investments, the list of tasks;
  • calculation of the delivery time of materials and equipment;
  • determination of the required number of personnel and types of equipment.

Let's take a closer look at how to make a schedule.

Algorithm

Development of the calendar plan is carried out on the basis of:

Structure

The timetable, an example of which is presented below, consists of the calculated (left) and graphic (right) parts.

The first part contains information like this:

  • List and scope of work.
  • Labor intensity, time expenditures, calculated according to standards.
  • Equipment efficiency in 2 shifts. Interruptions, downtime, change of location should be minimized.
  • Duration of mechanized and manual work.
  • Limit number of persons employed in production.
  • Number of shifts: equipment is involved in two shifts, and personnel in one.

The graph on the right side clearly reflects the progress of work, their sequence, linkage. The terms are set based on the standards.

To determine the time of implementation of activities aimed at achieving the goals of the project, and to establish relationships between them in terms of time, taking into account the most risky events, a project schedule is drawn up. Scheduling is the creation and subsequent refinement of the schedule, which takes into account the scope of work, risks, limitations. Since the schedule in the form of a list of exclusively planned parameters of work without comparison with the actual deadlines loses its meaning, often, instead of the schedule, the name of the schedule is used.

Article content

Scheduling Entity

  • planning the project content and building a work breakdown structure,
  • building a sequence of works and a network schedule,
  • drawing up a plan for deadlines, durations, coordination logical connections of work and their display on Gantt charts or tables,
  • determination of resource requirements (in personnel, mechanisms, materials, etc.) and drawing up a plan for the use of resources,
  • calculation project labor costs and other costs.

After the project enters the stage of practical implementation - execution of the planned actions - the progress of work is monitored according to the schedule, and corrective changes are made.

Planning the scope of work involves the appointment of responsible executors for tasks and deadlines. Tasks as a static category with their sequence are transferred to the dynamic category of work status, which lead to the result of the project. These tasks, given in the work format, are summarized in a graph and / or table. Tasks express the essence of the results according to the criterion of implementation ("solved / not solved"). Accordingly, the start time for tasks is not as significant as the end date.

A timetable is drawn up, usually by the project manager, who involves experts in various fields for this purpose. Experts should help organize a complete list of works in a hierarchical manner. Then the duration of the work and their interdependence are determined. Some jobs can be done simultaneously (in parallel), and some can only be done in series. For clarity, these relationships are presented in the form of Gantt charts, in which a hierarchical list of tasks is located along one axis (vertically), and a calendar scale on the other axis. The scheduling should result in a calendar-oriented, hierarchically structured plan that includes a complete list of activities.

The resource model of the project is also part of the scheduling. The need for performers for a particular stage of work and the degree of uniqueness of their qualifications, the availability of raw materials and consumables, mechanisms and equipment are taken into account. The resource base is assessed by the characteristics of time (calendar or daily employment), the cost of using resources, the maximum availability of the resource in percent.

Scheduling options

In its simplest form, the parameters of the schedule are the start and end dates of each job, the duration, and the resources required for these jobs. Complex schedules have several options for starting and ending work, their duration and time reserves. The methodology for calculating network models makes it possible to calculate only early and late dates. The original (base) planned dates and current dates must be selected taking into account other factors. There are three main choices:

Work Schedule (Schedule)

Nobody knows what they can do until they try.

Target management works when you know your goals. But 9 times out of 10 you don't know them.

A Work Schedule, also referred to as a Company Work Schedule, or Work Schedule, contains specific or planned dates for decisions, assignments, and goals (or benchmarks, such as budget execution). It also describes the steps that will be taken to meet the challenges associated with management, PR, guarantees and personal goals. From month to month or quarterly, the company finances the activities indicated in the work schedule (it also tells who is doing the work).

Statement of objectives and assessment of progress

Once you have selected your short-term and long-term goals and objectives (see “Day 5”), divide them into smaller tasks and detailed action plans. Then, articulate priorities, assign responsibilities, set due dates and decision points to measure progress. In the planning process, consider: 1) what impact each assignment has on income and expenses, in particular on monthly cash flows and profits; 2) in what time, in the opinion of employees, the task will be completed.

Decision Points are criteria for assessing the achievement of results. Here are the dates, planned sales and production levels, which are the decision points.

PLEASE NOTE. An action plan that is both significant and costly can be implemented incrementally as the budget permits, or sometimes deferred indefinitely. Let go of over-ambition by setting target dates. This requires the team leader to explain to the employees how long it will take to complete the assignment, justifying the correct target date. Remember, in most cases, employees already have a work schedule and are very busy. If the staff does not have time to solve the tasks assigned to them, your plans become unrealistic and meaningless.

Staying where you are is like crossing out the achieved result.

MURRAY WEIDENBAUM, Economist

Too Much Waste in the Work Environment At the same time, we constantly lament how difficult it is to make money, ignore the wastefulness that surrounds us, and miss out on opportunities for improvement.

KIYOSHI SUZAKI. "Tasks of modern production"

Production plan (customer service)

Planning is an integral part of project implementation. The key point in planning is the creation of a calendar plan, or, as they sometimes say, a calendar schedule. The time schedule helps to meet the requirements of the project work and clearly understand what actions will be performed and for how long.

The article presents the parameters of the schedule, technologies and methods of creation, programs to help managers and executors of projects. A list of planning documents is provided.

Nature and Scheduling Tasks

First, it is worth defining project scheduling. Scheduling is a collection of documented decisions that answer the questions: why, how, when and by whom the project will be implemented. The calendar plan is the result of planning, its material confirmation, presented in the form of a complex diagram. The scheme is checked and approved with the management of the company.

When a schedule is created, mandatory and applied tasks are solved. During planning you need:

The timetable is presented either as a complex diagram or as a simple list of activities and deadlines.

The project manager is responsible for how the project progresses. He is also appointed as the head of the schedule. The manager reports to the executors who are responsible for individual items of the plan and provide reports on the work. If inconsistencies arise in the course of work, the manager is obliged to find out their reasons and adjust the plan. To solve global planning problems, meetings are held at which the fate of individual stages and the whole project is decided.

All participants should be aware of the role they are playing. They must be provided with the required documents, a workplace, high-quality tools and materials for the implementation of activities.

Scheduling is used to streamline activities and improve productivity. The plan helps you see an expanded and accurate project schedule.

Scheduling options

Main parameters of the calendar schedule:

  • start and finish of work
  • duration of work
  • resource base

Start and finish of work. Early start is the official start of work. Late finish - the date on which the completion of the work is scheduled. In addition, there is an even late start and an early end. The gap between the original dates and the closing dates is called the slack. As a rule, the duration of the work remains the same, so the time reserve between early and late start and early and late finish will be the same.

Planning is an integral part of project implementation. The key point in planning is the creation of a calendar plan, or, as they sometimes say, a calendar schedule. The time schedule helps to meet the requirements of the project work and clearly understand what actions will be performed and for how long.

The article presents the parameters of the schedule, technologies and methods of creation, programs to help managers and executors of projects. A list of planning documents is provided.

Nature and Scheduling Tasks

First, it is worth defining project scheduling. Scheduling is a collection of documented decisions that answer the questions: why, how, when and by whom the project will be implemented. The calendar plan is the result of planning, its material confirmation, presented in the form of a complex diagram. The scheme is checked and approved with the management of the company.

When a schedule is created, mandatory and applied tasks are solved. During planning you need:

The timetable is presented either as a complex diagram or as a simple list of activities and deadlines.

The project manager is responsible for how the project progresses. He is also appointed as the head of the schedule. The manager reports to the executors who are responsible for individual items of the plan and provide reports on the work. If inconsistencies arise in the course of work, the manager is obliged to find out their reasons and adjust the plan. To solve global planning problems, meetings are held at which the fate of individual stages and the whole project is decided.

All participants should be aware of the role they are playing. They must be provided with the required documents, a workplace, high-quality tools and materials for the implementation of activities.

Scheduling is used to streamline activities and improve productivity. The plan helps you see an expanded and accurate project schedule.

Scheduling options

Main parameters of the calendar schedule:

  • start and finish of work
  • duration of work
  • resource base

Start and finish of work. Early start is the official start of work. Late finish - the date on which the completion of the work is scheduled. In addition, there is an even late start and an early end. The gap between the original dates and the closing dates is called the slack. As a rule, the duration of the work remains the same, so the time reserve between early and late start and early and late finish will be the same.